A practical guide for capital projects directors on package boundaries, interface risk and payment terms, so scope gaps are decided on paper and not discovered on site as variations.
Part of the SmartBuyer Procurement Guide Series.
Nobody designs a scope gap. It appears because two package documents were written separately, and each assumed the other trade would cover a detail. Read together, a strip of work belongs to nobody, and it reaches site as a variation priced at whatever rate the trade on site feels entitled to charge.
This guide shows you how to map physical boundaries before drafting, build an interface schedule into every contract, check each package’s payment mechanism, plan for the proposed retention ban, and name who settles a boundary dispute before one happens.
If any of these describe you, this guide will earn back its 15 minutes.
Directors
Sponsors
Managers
Procurement
Commercial Leads
Directors
If any of these describe you, this guide will earn back its 15 minutes.
Splitting works into packages looks like a drafting exercise. Our specialists treat it as a risk-allocation exercise that has to survive contact with a real site. This guide turns that experience into a process you can follow.
Written by a specialist with hands-on experience of packaging and contracting construction works, not theory. They are part of a network of 500+ procurement specialists who buy these categories every day.